Managing Steading Drainage and Rural Sustainable Drainage Systems
Date published: 16 January, 2023
For recent changes to this guidance, please see the bottom of the page.
Table of Contents
- Introduction
- Eligibility
- Spatial targeting
- Application requirements
- Requirements
- Payment
- Inspections
- Additional guidance
- Recent changes
- Previous versions
- Download guidance
Introduction
The aim of this item is to improve water quality by helping to minimise the volume of dirty water and slurry produced by creating drainage breaks, and to allow surface water run-off from clean or lightly contaminated surfaces to be conveyed to a rural sustainable drainage system feature.
Reducing dirty water around the steading can: Leave more space for slurry or silage effluent storage. Cutting down dirty and contaminated areas around the steading will reduce the amount of water you have to collect and handle, saving time and costs on storage and application to land.
This item will fund works such as:
- the installation of underground pipework to convey drainage from a collection point to where it will be discharged, such as to a slurry collection facility or to a rural sustainable drainage system
- concreting discrete areas of existing uncovered steading surfaces to minimise the contamination of clean run-off or help create a drainage break, such as in conjunction with a channel or ramp
- re-grading discrete areas of existing concrete to change the direction of run-off
- the installation of ramps / sleeping policemen and / or channels or kerbs to help keep clean and dirty water separate
This item cannot be used to concrete extensive areas of a steading or to maintain existing concrete surfaces.
Rural sustainable drainage systems, such as wetlands, ponds and swales can then be used to treat the drainage collected from clean or lightly contaminated areas.
Many rural sustainable drainage systems features can also offer potential biodiversity and landscape benefits.
Eligibility
Any land is eligible, provided it meets all of the requirements set out below.
You must combine this item with at least one of the following associated capital items, unless the capital items were completed in a previous AECS contract and the existing rSUDS will also deal with runoff from the proposed work. Evidence to support this must be supplied in the DP Steading Assessment.
Spatial targeting
You can check if this item is available on your holding using the search targeting tool which can be found on any of the following AECS guidance pages:
Application requirements
You must prepare a diffuse pollution steading assessment which must include a map of the steading, identifying clean and dirty yard areas, and the actions that will be taken to improve drainage management, a steading management map and associated steading assessment and management tables.
Requirements
Lightly contaminated run-off collected via works funded under this item must not be conveyed to a watercourse or clean water drain, unless via a suitable rural sustainable drainage system.
Payment
The maximum payment under this item is £10,000.
You can claim:
Standard cost items
- underground drainage (including surface fittings, underground pipe, fittings, access chambers) – £35.46 per linear metre
- concreting existing uncovered steading or court surfaces – £32.27 per square metre
- surface drainage interception:
- re-grade existing concrete areas – £34.53 per square metre
- installation of ramps / sleeping policemen – £40.39 per square metre
Actual cost items
To ensure value for money, we require you to provide three competitive quotes for the installation of kerbs / channels / cross drains.
This can include:
- purchase and installation of proprietary shallow-surface drainage channels, including cover lid or grate
- purchase and installation of proprietary kerbs
- installation and formation of kerb or channels from concrete in situ
Inspections
The inspectors will check:
- the linear length of drainage (including surface fittings, underground pipe, fittings and access chambers)
- the area of any concreting of existing uncovered steading or court surfaces
- the area of any surface drainage interception
- that lightly contaminated run-off collected via works does not drain directly to a watercourse
Additional guidance
Recent changes
Section | Change |
---|---|
Eligibility | Updated text - circumstances where this option does not need to be combined with one of the associated capital items listed and justification to be provided |
Application Requirements | Insertion of link to Diffuse Pollution Risk assessment and Diffuse Pollution Steading Assessment web pag and added text reiterating message on Diffuse Pollution page that a steading management map and associated steading assessment and management tables are required. |
Previous versions
Download guidance
Click 'Download this page' to create a printer-friendly version of this guidance that you can save or print out.